Painting a commercial building exterior in the GTA

Quick answer

A new look without a new building.

Painting the outside of a commercial building is one of the biggest visible changes an owner can make to a property. Dated brick can become a clean, modern building that looks new from the road. What decides the result is the prep, the right primer for the surface, safe access to the height and a schedule that works for the tenants. Here’s how those jobs run, with three real buildings we’ve painted.

Real commercial exteriors
Industrial plaza, Mississauga80,000 sq ft, red brick to white, 400+ gallons of paint
Two buildings, VaughanBrown brick to white and black, three painters, six weeks
Commercial building, TorontoAbout 250 gallons; rusty stairs painted black
01 · Why

What a repaint does for a dated building

A commercial building doesn’t have to be failing to need paint. Sometimes it just looks old, and the colour of the brick is a big part of that. A repaint changes how the whole property reads, for tenants and for people driving past.

Industrial plaza painted white with dark trim
Real project · Mississauga · Commercial · 2023An industrial plaza, red brick to whiteThe owners wanted to modernize a dated red-brick plaza in Mississauga. We painted the 80,000 sq ft of building white, using more than 400 gallons of paint.See the project

Simple colour schemes tend to work well on big buildings. On the Toronto job below, the body is Benjamin Moore Intense White (OC-51), with the windows and doors in Benjamin Moore black.

Commercial building after repainting
Real project · Toronto · Commercial · 2021A commercial building, made overA Toronto commercial building that needed a fresh, modern look for its tenants: about 250 gallons of paint, and rusty stairs painted black.See the project
02 · Prep

Prep and primer come first

Outside, prep is everything. If the surface isn’t clean, sound and primed, the best paint in the world will peel. Each material needs its own approach:

A

Brick

Needs the right cleaning and a breathable primer and paint system. Not every brick wall is a good candidate, and Paul will tell you honestly if yours isn’t.

B

Stucco and siding

Washed, with loose paint scraped and bare spots primed.

C

Metal stairs and railings

Rust and loose paint come off first, so the new finish has something sound to grip.

D

Doors and windows

Usually a contrasting colour, with clean edges. They’re often what makes a building look finished.

Primer can be a big part of the job. The two Vaughan buildings took over 200 gallons of primer before the 350 gallons of paint.

Vaughan commercial building with brown brick before painting
The same Vaughan commercial building painted white with black bands
03 · Plan

Tenants, access and the schedule

  1. 01Walkthrough. Paul sees the building, the surfaces and the access, and sends a free written quote.
  2. 02Tenants and hours. We schedule around your hours, landlord rules and other trades, to keep disruption to a minimum.
  3. 03Height and access. Ladders, planks or a lift, depending on the height and what’s around the building.
  4. 04Spray or roll. Decided by the surface and the space, with minimal disruption.
Commercial building painted white with black bands
Real project · Vaughan · Commercial · 2022A Vaughan building, brown to white and blackTwo large side-by-side buildings in Vaughan, brown brick to white with black accents. Three painters, six weeks, and a building that looks new from the road.See the project
04 · Timing

When to book an exterior repaint

Exterior work in the GTA generally runs from late spring to early fall, when temperatures stay above the paint’s minimum and nights aren’t too cold. Big buildings take weeks, not days, so it pays to get a quote well before the season starts.

For more on how long the finish lasts, read how long exterior paint lasts in Ontario. For store interiors, see repainting a store overnight.

See our commercial and retail painting service, or get a quote for your building.

Questions people ask

FAQ

Can you paint a brick commercial building?

Often, yes. Brick needs the right cleaning and a breathable primer and paint system. We painted a red-brick plaza in Mississauga white and took two Vaughan buildings from brown brick to white and black.

How long does it take to paint a commercial building exterior?

It depends on size and access. Two large buildings in Vaughan took three painters six weeks. Paul gives you a schedule with your quote.

How much paint does a commercial building take?

A lot. Our 80,000 sq ft plaza in Mississauga used more than 400 gallons of paint. The two Vaughan buildings took over 200 gallons of primer and 350 gallons of paint.

Can tenants stay open during the work?

We plan the job around your hours, landlord rules and other trades, with minimal disruption. Tell Paul about your tenants when he quotes.

Which areas do you paint commercial buildings in?

Toronto and the GTA. Our commercial exteriors include buildings in Toronto, Mississauga and Vaughan.

Paul Marchesseau

Have a building that looks dated?

Send Paul the address, a few photos and your timeline. You’ll get a free quote planned around your tenants.

Talk soon, Paul
Text PaulCallQuote