What a repaint does for a dated building
A commercial building doesn’t have to be failing to need paint. Sometimes it just looks old, and the colour of the brick is a big part of that. A repaint changes how the whole property reads, for tenants and for people driving past.

Simple colour schemes tend to work well on big buildings. On the Toronto job below, the body is Benjamin Moore Intense White (OC-51), with the windows and doors in Benjamin Moore black.

Prep and primer come first
Outside, prep is everything. If the surface isn’t clean, sound and primed, the best paint in the world will peel. Each material needs its own approach:
Brick
Needs the right cleaning and a breathable primer and paint system. Not every brick wall is a good candidate, and Paul will tell you honestly if yours isn’t.
Stucco and siding
Washed, with loose paint scraped and bare spots primed.
Metal stairs and railings
Rust and loose paint come off first, so the new finish has something sound to grip.
Doors and windows
Usually a contrasting colour, with clean edges. They’re often what makes a building look finished.
Primer can be a big part of the job. The two Vaughan buildings took over 200 gallons of primer before the 350 gallons of paint.


Tenants, access and the schedule
- 01Walkthrough. Paul sees the building, the surfaces and the access, and sends a free written quote.
- 02Tenants and hours. We schedule around your hours, landlord rules and other trades, to keep disruption to a minimum.
- 03Height and access. Ladders, planks or a lift, depending on the height and what’s around the building.
- 04Spray or roll. Decided by the surface and the space, with minimal disruption.

When to book an exterior repaint
Exterior work in the GTA generally runs from late spring to early fall, when temperatures stay above the paint’s minimum and nights aren’t too cold. Big buildings take weeks, not days, so it pays to get a quote well before the season starts.
For more on how long the finish lasts, read how long exterior paint lasts in Ontario. For store interiors, see repainting a store overnight.
See our commercial and retail painting service, or get a quote for your building.
FAQ
Can you paint a brick commercial building?
Often, yes. Brick needs the right cleaning and a breathable primer and paint system. We painted a red-brick plaza in Mississauga white and took two Vaughan buildings from brown brick to white and black.
How long does it take to paint a commercial building exterior?
It depends on size and access. Two large buildings in Vaughan took three painters six weeks. Paul gives you a schedule with your quote.
How much paint does a commercial building take?
A lot. Our 80,000 sq ft plaza in Mississauga used more than 400 gallons of paint. The two Vaughan buildings took over 200 gallons of primer and 350 gallons of paint.
Can tenants stay open during the work?
We plan the job around your hours, landlord rules and other trades, with minimal disruption. Tell Paul about your tenants when he quotes.
Which areas do you paint commercial buildings in?
Toronto and the GTA. Our commercial exteriors include buildings in Toronto, Mississauga and Vaughan.










